Portal de Cieza

www.portaldecieza.com

Cieza - SpanishCieza - English
detail of Cieza

 

The solution to the situation of the APE-9 "requires unanimous agreement on its implementation and effectiveness" (02/07/2014)

The situation that has occurred throughout the cropping season in Cieza on vacant land adjacent to Station Road Sector developable designated in the General Plan as APE-9 has shown "that continue to occur in our immediate environment more typical of earlier times or other socioeconomic contexts and situations they can not indulge in a democratic society and promoting human rights is supposed to be ours. "

This is at least the opinion of IU-Greens councilor in the city of Cieza, José Eduardo Illueca, who said "the problem is complex but it is clear that the solution is not to close our eyes to reality and continue without anything about it, as has happened over recent years. "

First, "it is unacceptable that the dirt and degradation extend and advance the way they do in the APE-9, or that persists in the town center area so degraded from the points of aesthetic, urban and social, as it is not permissible that the adjacent neighbors repeatedly suffer damage, especially those most affected by this situation, who are living in the only building on the street Pastor Germán Arias ".

In Illueca words, "when the walker moves through the streets around these areas is the feeling that you've gone through a time warp to appear in a different world, a world of trash, unhealthy, misery and abandonment."

In the field APE-9 two distinct problems but added that intertwine in this review councilman: the problems arising "from an incomprehensible lack of urbanization, dating back tens of years and that is the ultimate cause of the degradation area "is added, compounding the problem," the existence, at the back of the building of the Street Pastor Germán Arias of Campfires in appalling conditions of temporary workers during the growing season, not residing in Cieza and they can not access by their economic situation, the rental of a dwelling, a scenario that also occurs in other enclaves of people and surroundings but in the APE-9 reaches levels greater visibility and annoyance to the citizens. "

From IU-Greens Cieza, is considered "that it is time to listen to the neighbors and definitively solve the problems of APE-9 and that the political impetus for this may no longer be expected, therefore, the local executive power should be involved in immediate action and durability. "

Measures should address both aspects of the problem, ie "ensure full compliance and as quickly as possible for the determinations as to the urbanization of the area are provided in the General Plan, on the one hand, and, another, build or equip a shelter to serve as accommodation for people who come to work as seasonal in Cieza, equipped with all basic services, including cleaning and maintenance. "

For ciezanos ecosocialistas in this endeavor should be involved and assist the City Hall, cooperatives and agricultural companies.

As own contribution, the group of IU-Greens Cieza has submitted a proposal "that aims to be sensitive to both complaints from neighbors and the unbearable social situation of these workers, which propose different measures, such as the urgent cleaning entire sector, removal of accumulated trash and transfer to an approved landfill, developing a memory-report, and agreed on the potential social conveniados land uses as its development is not commenced, and construction or equip a shelter to house seasonal workers, with the cooperation of the City and agricultural entrepreneurs. "

Source: IU-verdes Cieza

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información